The Gateway Arch is a 630-foot-tall (192 m) monument in St. Louis, Missouri, United States. Clad in stainless steel and built in the form of a weighted catenary arch, it is the world's tallest arch, Missouri's tallest accessible structure, and no building can be taller than the arch in the St. Louis area. Some sources consider it the tallest human-made monument in the Western Hemisphere. Built as a monument to the westward expansion of the United States and officially dedicated to "the American people", the Arch, commonly referred to as "The Gateway to the West", is a National Historic Landmark in Gateway Arch National Park and has become a popular tourist destination, as well as an internationally recognized symbol of St. Louis.

The Arch was designed by the Finnish-American architect Eero Saarinen in 1947. Construction began on February 12, 1963, and was completed on October 28, 1965, at an overall cost of $13 million (equivalent to $98.4 million in 2024). The monument opened to the public on June 10, 1967.

It is located at the 1764 site of the founding of St. Louis on the west bank of the Mississippi River.

Gateway Arch
Fair use via Wikimedia Commons

Historical background

Inception and funding (1933–1935)

Around late 1933, civic leader Luther Ely Smith, returning to St. Louis from the George Rogers Clark National Historical Park in Vincennes, Indiana, saw the St. Louis riverfront area and envisioned that building a memorial there would both revive the riverfront and stimulate the economy. He communicated his idea to mayor Bernard Dickmann, who on December 15, 1933, raised it in a meeting with city leaders. They sanctioned the proposal, and the nonprofit Jefferson National Expansion Memorial Association (JNEMA) was formed. Smith was appointed chairman and Dickmann vice chairman. The association's goal was to create:

A suitable and permanent public memorial to the men who made possible the western territorial expansion of the United States, particularly President Jefferson, his aides Livingston and Monroe, the great explorers, Lewis and Clark, and the hardy hunters, trappers, frontiersmen and pioneers who contributed to the territorial expansion and development of these United States, and thereby to bring before the public of this and future generations the history of our development and induce familiarity with the patriotic accomplishments of these great builders of our country.

Many locals did not approve of depleting public funds for the cause. Smith's daughter SaLees related that when "people would tell him we needed more practical things", he would respond that "spiritual things" were equally important.

Gateway Arch
Rwietlake · CC BY-SA 4.0 via Wikimedia Commons

The association expected that $30 million would be needed to undertake the construction of such a monument (about $576 million in 2024 dollars). It called upon the federal government to foot three-quarters of the bill ($22.5 million).

The suggestion to renew the riverfront was not original, as previous projects were attempted but lacked popularity. The Jefferson memorial idea emerged amid the economic disarray of the Great Depression and promised new jobs. The project was expected to create 5,000 jobs for three to four years. Committee members began to raise public awareness by organizing fundraisers and writing pamphlets. They also engaged Congress by planning budgets and preparing bills, in addition to researching ownership of the land they had chosen, "approximately one-half mile in length ... from Third Street east to the present elevated railroad." In January 1934, Senator Bennett Champ Clark and Representative John Cochran introduced to Congress an appropriation bill seeking $30 million for the memorial, but the bill failed to garner support due to the large amount of money solicited. In March of the same year, joint resolutions proposed the establishment of a federal commission to develop the memorial. Although the proposal aimed for only authorization, the bill incurred opposition because people suspected that JNEMA would later seek appropriation. On March 28 the Senate bill was reported out, and on April 5 it was turned over to the House Library Committee, which later reported favorably on the bills. On June 8, both the Senate and House bills were passed. On June 15, President Franklin D. Roosevelt signed the bill into law, instituting the United States Territorial Expansion Memorial Commission. The commission comprised 15 members, chosen by Roosevelt, the House, the Senate, and JNEMA. It first convened on December 19 in St. Louis, where members examined the project and its planned location.

Meanwhile, in December, the JNEMA discussed organizing an architectural competition to determine the design of the monument. Local architect Louis LaBeaume had drawn up competition guidelines by January 1935. On April 13, 1935, the commission certified JNEMA's project proposals, including memorial perimeters, the "historical significance" of the memorial, the competition, and the $30 million budget. Between February and April, the Missouri State Legislature passed an act allowing the use of bonds to facilitate the project. On April 15, then Governor Guy B. Park signed it into law. Dickmann and Smith applied for funding from two New Deal agencies—the Public Works Administration (headed by Harold Ickes) and the Works Progress Administration (headed by Harry Hopkins). On August 7, both Ickes and Hopkins assented to the funding requests, each promising $10 million, and said that the National Park Service (NPS) would manage the memorial. A local bond issue election granting $7.5 million (about $144 million in 2024 dollars) for the memorial's development was held on September 10 and passed.

Gateway Arch
Paulmcdonald · CC BY-SA 4.0 via Wikimedia Commons

On December 21, President Roosevelt signed Executive Order 7253 to approve the memorial, allocating the 82-acre area as the first National Historic Site. The order also appropriated $3.3 million through the WPA and $3.45 million through the PWA ($6.75 million in total). The motivation of the project was two-fold—commemorating westward expansion and creating jobs. Some taxpayers began to file suits to block the construction of the monument, which they called a "boondoggle".

Initial planning (1936–1939)

Using the 1935 grant of $6.75 million and $2.25 million in city bonds, the NPS acquired the historic buildings within the historic site—through condemnation rather than purchase—and demolished them. By September 1938, condemnation was complete. The condemnation was subject to many legal disputes which culminated on January 27, 1939, when the United States Circuit Court of Appeals ruled that condemnation was valid. A total of $6.2 million was distributed to land owners on June 14. Demolition commenced on October 9, 1939, when Dickmann extracted three bricks from a vacant warehouse.

Led by Paul Peters, adversaries of the memorial delivered to Congress a leaflet titled "Public Necessity or Just Plain Pork". The JNEMA's lawyer, Bon Geaslin, believed that the flyers did not taint the project, but motivated members of Congress to find out more about the same. Although Representative John Cochran wanted to ask Congress to approve more funds, Geaslin believed the association should "keep a low profile, maintaining its current position during this session of Congress". He advised the association to "get a good strong editorial in one of the papers to the effect that a small group of tenants ... is soliciting funds [to fight] the proposed improvement, and stating that these efforts do not represent the consensus of opinion in St. Louis ... , and pointing out that such obstructions should be condemned".

Gateway Arch
Ajay Suresh from New York, NY, USA · CC0 via Wikimedia Commons

Congress's reduction in spending made it impossible for the allocated funds to be obtained. NPS responded that the city would reduce its contribution if the federal government did. It also asserted that the funds were sanctioned by an executive order, but superintendent John Nagle pointed out that what "one Executive Order does, another can undo". In March 1936, Representative Cochran commented during a House meeting that he "would not vote for any measure providing for building the memorial or allotting funds to it". Geaslin found Cochran's statements to be a greater hindrance to the project than Paul Peters' opposition, for Congress might have Cochran's opinions as representative of public opinion.

Peters and other opponents asked Roosevelt to rescind Executive Order 7253 and to redirect the money to the American Red Cross. Smith impugned their motives, accusing them of being "opposed to anything that is ever advanced in behalf of the city." In February 1936, an editorial written by Paul W. Ward in The Nation denounced the project. Smith was infuriated, fearing the impact of attacks from a prestigious magazine, and wanted "to jump on it strong with hammer and tongs". William Allen White, a renowned newspaper editor, advised Smith not to fret.

Because the Mississippi River played an essential role in establishing St. Louis's identity as the gateway to the west, it was felt that a memorial commemorating it should be near the river. Railroad tracks that had been constructed in the 1930s on the levee obstructed views of the riverfront from the memorial site. When Ickes declared that the railway must be removed before he would allocate funds for the memorial, President of the St. Louis Board of Public Service Baxter Brown suggested that "a new tunnel ... conceal the relocated tracks and re-grading of the site to elevate it over the tunnel. These modifications would eliminate the elevated and surface tracks and open up the views to the river." Although rejected by NPS architect Charles Peterson, Brown's proposal formed the basis for the ultimate settlement.

Gateway Arch
G1B71 · CC0 via Wikimedia Commons

By May 1942, demolition was complete. The Old Cathedral and the Old Rock House, because of their historical significance, were the only buildings retained within the historic site. The Old Rock House was later dismantled in 1959 with the intention of reassembling it at a new location, but pieces of the building went missing. Part of the house has been reconstructed in the basement of the Old Courthouse.

Design competition (1945–1948)

In November 1944, Smith discussed with Newton Drury, the National Park Service Director, the design of the memorial, asserting that the memorial should be "transcending in spiritual and aesthetic values", best represented by "one central feature: a single shaft, a building, an arch, or something else that would symbolize American culture and civilization."

The idea of an architectural competition to determine the design of the memorial was favored at the JNEMA's inaugural meeting. They planned to award cash for the best design. In January 1945, the JNEMA officially announced a two-stage design competition that would cost $225,000 to organize. Smith and the JNEMA struggled to raise the funds, garnering only a third of the required total by June 1945. Then mayor Aloys Kaufmann feared that the lack of public support would lead officials to abandon hope in the project. The passage of a year brought little success, and Smith frantically underwrote the remaining $40,000 in May 1946. By June, Smith found others to assume portions of his underwriting, with $17,000 remaining under his sponsorship. In February 1947, the underwriters were compensated, and the fund stood at over $231,199.

Gateway Arch
Shealeah Craighead · Public domain via Wikimedia Commons

Local architect Louis LaBeaume prepared a set of specifications for the design, and architect George Howe was chosen to coordinate the competition. On May 30, 1947, the contest officially opened. The seven-member jury that would judge the designs comprised Charles Nagel Jr., Richard Neutra, Roland Wank, William Wurster, LaBeaume, Fiske Kimball, and S. Herbert Hare. The competition comprised two stages—the first to narrow down the designers to five and the second to single out one architect and his design. The design intended to include:

(a) an architectural memorial or memorials to Jefferson; dealing (b) with preservation of the site of Old St. Louis—landscaping, provision of an open-air campfire theater, reerection or reproduction of a few typical old buildings, provision of a Museum interpreting the Westward movement; (c) a living memorial to Jefferson's 'vision of greater opportunities for men of all races and creeds;' (d) recreational facilities, both sides of the river; and (e) parking facilities, access, relocation of railroads, placement of an interstate highway.

The team included Eero Saarinen as designer, J. Henderson Barr as associate designer, and Dan Kiley as landscape architect, as well as Lily Swann Saarinen as sculptor and Alexander Girard as painter. In the first stage of the competition, Carl Milles advised Saarinen to change the bases of each leg to triangles instead of squares. Saarinen said that he "worked at first with mathematical shapes, but finally adjusted it according to the eye." At submission, Saarinen's plans laid out the arch at 569 feet (173 m) tall and 592 feet (180 m) wide from center to center of the triangle bases.

On September 1, 1947, submissions for the first stage were received by the jury. The submissions were labeled by numbers only, and the names of the designers were kept anonymous. Upon four days of deliberation, the jury narrowed down the 172 submissions, which included Saarinen's father Eliel, to five finalists, and announced the corresponding numbers to the media on September 27. Eero Saarinen's design (#144) was among the finalists, and comments written on it included "relevant, beautiful, perhaps inspired would be the right word" (Roland Wank) and "an abstract form peculiarly happy in its symbolism" (Charles Nagel). Hare questioned the feasibility of the design but appreciated the thoughtfulness behind it. Local St. Louis architect Harris Armstrong was also one of the finalists. The secretary who sent out the telegrams informing finalists of their advancement mistakenly sent one to Eliel rather than Eero. The family celebrated with champagne, and two hours later, a competition representative called to correct the mistake. Eliel "'broke out a second bottle of champagne' to toast his son." They proceeded to the second stage, and each was given a $10,069 prize (about $110,730 in 2024 dollars). Saarinen changed the height of the arch from 580 feet to 630 feet (190 m) and wrote that the arch symbolized "the gateway to the West, the national expansion, and whatnot." He wanted the landscape surrounding the arch to "be so densely covered with trees that it will be a forest-like park, a green retreat from the tension of the downtown city," according to The New York Times architectural critic Aline Bernstein Louchheim. The deadline for the second stage arrived on February 10, 1948, and on February 18, the jury chose Saarinen's design unanimously, praising its "profoundly evocative and truly monumental expression." The following day, during a formal dinner at Statler Hotel that the finalists and the media attended, Wurster pronounced Saarinen the winner of the competition and awarded the checks—$40,000 to his team and $50,000 to Saarinen. The competition was the first major architectural design that Saarinen developed unaided by his father.

On May 25, the United States Territorial Expansion Memorial Commission endorsed the design. Later, in June, the NPS approved the proposal. Representative H. R. Gross, however, opposed the allocation of federal funds for the arch's development.

The design drew varied responses. In a February 29, 1948, The New York Times article, Louchheim praised the arch's design as "a modern monument, fitting, beautiful and impressive." Some local residents likened it to a "stupendous hairpin and a stainless steel hitching post." The most aggressive criticism emerged from Gilmore D. Clarke, whose February 26, 1948, letter compared Saarinen's arch to one imagined by fascist Benito Mussolini for the canceled 1942 World Expo in Rome, rendering the arch a fascist symbol. This allegation of plagiarism ignited fierce debates among architects about its validity. Douglas Haskell from New York wrote that "The use of a common form is not plagiarism ... this particular accusation amounts to the filthiest smear that has been attempted by a man highly placed in the architectural profession in our generation." Wurster and the jury refuted the charges, arguing that "the arch form was not inherently fascist but was indeed part of the entire history of architecture." Saarinen considered the opposition absurd, asserting, "It's just preposterous to think that a basic form, based on a completely natural figure, should have any ideological connection."

By January 1951, Saarinen created 21 "drawings, including profiles of the Arch, scale drawings of the museums and restaurants, various parking proposals, the effect of the levee-tunnel railroad plan on the Arch footings, the Arch foundations, the Third Street Expressway, and the internal and external structure of the Arch." Fred Severud made calculations for the arch's structure.

Railroad agreement (1949–1958)

Several proposals were offered for moving the railroad tracks, including:

Bates-Ross. Tracks would cross the memorial site diagonally in a tunnel.

Bowen. Similar to Bates-Ross proposal.

Hill-Tunnel. Supported by Saarinen and NPS engineer Julian Spotts, it would route the tracks in a tunnel below Second and First Streets. Saarinen further said that if the tracks passed between the memorial and the river, he would withdraw his participation.

LaBeaume-Terminal. Opposed by Saarinen and the NPS, it would lay "three tracks on a contained fill along the lines of the elevated tracks."

Levee-Tunnel. Proposed by Frank J. McDevitt, president of the St. Louis Board of Public Service, it would lower the tracks into a tunnel concealed by walls and landscaping.

On July 7, 1949, in Mayor Joseph Darst's office, city officials chose the Levee-Tunnel plan, rousing JNEMA members who held that the decision had been pressed through when Smith was away on vacation. Darst notified Secretary of the Interior Julius Krug of the city's selection. Krug planned to meet with Smith and JNEMA but canceled the meeting and resigned on November 11. His successor, Oscar L. Chapman, rescheduled the meeting for December 5 in Washington with delegates from the city government, JNEMA, railroad officials, and Federal government. A day after the conference, they ratified a memorandum of understanding about the plan: "The five tracks on the levee would be replaced by three tracks, one owned by the Missouri Pacific Railroad (MPR) and two by the Terminal Railroad Association of St. Louis (TRRA) proceeding through a tunnel not longer than 3,000 feet. The tunnel would be approximately fifty feet west of the current elevated line." It would also have an overhead clearance of 18 feet (5.5 m), lower than the regular requirement of 22 feet (6.7 m). Chapman approved the document on December 22, 1949, and JNEMA garnered the approval of the Missouri Public Service Commission on August 7, 1952.

Efforts to appropriate congressional funds began in January 1950 but were delayed until 1953 by the Korean War's depletion of federal funds.

In August 1953, Secretary of the Interior Fred A. Seaton declared that the Department of the Interior and the railroads should finalize the agreement on the new route. In October, NPS and the TRRA decided that the TRRA would employ a surveyor endorsed by Spotts "to survey, design, estimate, and report on" the expenses of shifting the tracks. They chose Alfred Benesch and Associates, which released its final report on May 3, 1957. The firm estimated that the two proposals would cost more than expected: more than $11 million and $14 million, respectively. NPS director Conrad Wirth enjoined Saarinen to make small modifications to the design. In October, Saarinen redrafted the plans, suggesting:

[the placement of] the five sets of railroad tracks into a shortened tunnel 100 feet west of the trestle, with the tracks being lowered sixteen feet. This did not mean that the memorial would be cut off from the river, however, for Saarinen provided a 960-foot-long (290 m) tunnel to be placed over the railroad where a "grand staircase" rose from the levee to the Arch. At the north and south ends of the park, 150-foot tunnels spanned the tracks, and led to the overlook museum, restaurant, and stairways down to the levee. Saarinen designed a subterranean visitor center the length of the distance between the legs, to include two theaters and an entrance by inward-sloping ramps.

On November 29, involved interests signed another memorandum of understanding approving Saarinen's rework; implementing it would cost about $5.053 million. On March 10, 1959, mayor Raymond Tucker proposed that they drop "the tunnel idea in favor of open cuts roofed with concrete slabs," which would cost $2.684 million, $1.5 million less than the cost of the approved plan. On May 12, 1958, Tucker, TRRA president Armstrong Chinn, and Missouri Pacific Railroad president Russell Dearmont entered a written agreement: "The TRRA would place $500,000 in escrow for the project, and the city [would] sell $980,000 of the 1935 bonds to match the Federal contribution." Director Wirth and Secretary Seaton approved the plan on June 2.

In July 1953, Representative Leonor Sullivan introduced H.R. 6549, a bill authorizing the allocation of no more than $5 million to build the arch. After much negotiation, both houses of Congress approved the bill in May 1954, and on May 18, 1954, President Dwight D. Eisenhower signed the bill into law as Public Law 361. Congress could not afford to appropriate the funds in 1955, so association president William Crowdus resorted to asking the Rockefeller and Ford Foundations for $10 million. The foundations denied the request because their function as private foundations did not include funding national memorials. In 1956, Congress appropriated $2.64 million to be used to move the railroad tracks. The remainder of the authorized appropriation was requested via six congressional bills, introduced on July 1, 1958, that revised Public Law 361 to encompass the cost of the entire memorial, increasing federal funds by $12.25 million. A month later the Department of the Interior and the Bureau of the Budget endorsed the bill, and both houses of Congress unanimously passed the bill. Eisenhower signed it into law on September 7. The NPS held off on appropriating the additional funds, as it planned to use the already-appropriated funds to initiate the railroad work.

Final preparations (1959–1968)

Saarinen and city functionaries collaborated to zone buildings near the arch. In April 1959, real estate developer Lewis Kitchen decided to construct two 40-level edifices across from the arch. In July, after the plan was condemned for its potential obstruction of the arch, Kitchen discussed the issue with officials. A decision was delayed for several months because Saarinen had yet to designate the arch's height, projected between 590 and 630 feet (180 and 190 m). By October, Mayor Tucker and Director Wirth resolved to restrict the height of buildings opposite the arch to 275 feet (84 m) (about 27 levels), and the city stated that plans for buildings opposite the arch would require its endorsement. Kitchen then decreased the height of his buildings, while Saarinen increased that of the arch.

Moving the railroad tracks was the first stage of the project. On May 6, 1959, after an official conference, the Public Service Commission called for ventilation to accompany the tunnel's construction, which entailed "placing 3,000 feet of dual tracks into a tunnel 105 feet west of the elevated railroad, along with filling, grading, and trestle work." Eight bids for the work were reviewed on June 8 in the Old Courthouse, and the MacDonald Construction Co. of St. Louis won with a bid of $2,426,115, less than NPS's estimate of the cost. At 10:30 a.m. on June 23, 1959, the groundbreaking ceremony occurred; Tucker spaded the first portion of earth. Wirth and Dickmann delivered speeches.

The NPS acquired the $500,000 in escrow and transferred it to MacDonald to begin building the new tracks. In August, demolition of the Old Rock House was complete, with workers beginning to excavate the tunnel. In November, they began shaping the tunnel's walls with concrete. Twenty-nine percent of the construction was completed by March and 95% by November. On November 17, trains began to use the new tracks. June 1962 was the projected date of fruition.

On May 16, 1959, the Senate appropriations subcommittee received from St. Louis legislators a request for $2.4911 million, of which it granted only $133,000. Wirth recommended that they reseek the funds in January 1960.

On March 10, 1959, Regional Director Howard Baker received $888,000 as the city's first subsidy for the project. On December 1, 1961, $23,003,150 in total had been authorized, with $19,657,483 already appropriated—$3,345,667 remained not yet appropriated.

Construction

The bidding date, originally December 20, 1961, was postponed to January 22, 1962, to clarify the details of the arch construction. About 50 companies that had requested the construction requirements received bidding invitations. Extending from $11,923,163 to $12,765,078, all four bids exceeded the engineer estimate of $8,067,000. Wirth had a committee led by George Hartzog determine the validity of the bids in light of the government's conditions. Following a meeting with the bidders, the committee affirmed the bids' reasonableness, and Wirth awarded the lowest bidder, MacDonald Construction Co. of St. Louis, the contract for the construction of the arch and the visitor center. On March 14, 1962, he signed the contract and received from Tucker $2.5 million, the city's subsidy for the phase. MacDonald reduced its bid $500,000 to $11,442,418. The Pittsburgh-Des Moines Steel Company served as the subcontractor for the shell of the arch.

In 1959 and 1960, ground was broken, and in 1961, the foundation of the structure was laid. Construction of the arch itself began on February 12, 1963, as the first steel triangle on the south leg was eased into place. These steel triangles, which narrowed as they rose to the top, were raised into place by a group of cranes and derricks. The arch was assembled of 142 12-foot-long (3.7 m) prefabricated stainless steel sections. Once in place, each section had its double-walled skin filled with concrete, prestressed with 252 tension bars. In order to keep the partially completed legs steady, a scissors truss was placed between them at 530 feet (160 m), later removed as the derricks were taken down. The whole endeavor was expected to be completed by fall 1964, in observance of St. Louis's bicentennial. Insurance underwriters had estimated that thirteen construction workers may die on the project, and, fortunately, no one had died in the construction of the project.

Contractor MacDonald Construction Co. arranged a 30-foot (9 m) tower for spectators and provided recorded accounts of the undertaking. In 1963, a million people went to observe the progress, and by 1964, local radio stations began to broadcast when large slabs of steel were to be raised into place. St. Louis Post-Dispatch photographer Art Witman documented the construction for the newspaper's Sunday supplement Pictures, his longest and most noted assignment. He visited the construction site frequently from 1963 to 1967, recording every stage of progress. With assistant Renyold Ferguson, he crawled along the catwalks with the construction workers up to 620 ft (190 m) above the ground. He was the only news photographer on permanent assignment at the construction, with complete access. He primarily worked with slide film but also used the only Panox camera in St. Louis to create panoramic photographs covering 140 degrees. Witman's pictures of the construction are now housed in the State Historical Society of Missouri.

The project manager of MacDonald Construction Co., Stan Wolf, said that a 62-story building was easier to build than the arch: "In a building, everything is straight up, one thing on top of another. In this arch, everything is curved."

Delays and lawsuits

Although an actuarial firm predicted thirteen workers would die while building the arch, no workers were killed during the monument's construction. However, construction of the arch was still often delayed by safety checks, funding uncertainties, and legal disputes.

Civil rights activists regarded the construction of the arch as a token of racial discrimination. On July 14, 1964, during the workers' lunchtime, civil rights protesters Percy Green and Richard Daly, both members of Congress of Racial Equality, climbed 125 feet (38 m) up the north leg of the arch to "expose the fact that federal funds were being used to build a national monument that was racially discriminating against black contractors and skilled black workers." As the pair disregarded demands to get off, protesters on the ground demanded that at least 10% of the skilled jobs belong to African Americans. Four hours later, Green and Daly dismounted from the arch to charges of "trespassing, peace disturbance, and resisting arrest." This incident inter alia spurred the United States Department of Justice to file the first pattern or practice case against AFL–CIO under Title VII of the Civil Rights Act of 1964, on February 4, 1966, but the department later called off the charges. The 1966 lawsuit was an attempt by the Office of Federal Contract Compliance (OFCC) to desegregate building-trade unions nationwide. Many technical building unions had little or no African-American representation into the mid-1960s. During Lyndon Johnson's presidency, the federal government recognized the need for more integration in all levels of society and started enforcing equal employment opportunity through federally funded job contracts.

In 1964, the Pittsburgh-Des Moines Steel Company of Warren, Pennsylvania, sued MacDonald for $665,317 for tax concerns. In 1965, NPS requested that Pittsburgh-Des Moines Steel remove the prominent letters "P-D-M" (its initials) from a creeper derrick used for construction, contending that it was promotional and violated federal law with regards to advertising on national monuments. Although Pittsburgh-Des Moines Steel initially refused to pursue what it considered a precarious venture, the company relented after discovering that leaving the initials would cost $225,000 and after that, $42,000 per month, and the NPS dropped its lawsuit.

On October 26, 1965, the International Association of Ironworkers delayed work to ascertain that the arch was safe. After NPS director Kenneth Chapman gave his word that conditions were "perfectly safe," construction resumed on October 27. After the discovery of 16 defects, the tram was also delayed from running. The Bi-State Development Agency assessed that it suffered losses of $2,000 for each day the trains were stagnant.

On January 7, 1966, members of AFL–CIO deserted their work on the visitor center, refusing to work with plumbers affiliated with Congress of Industrial Unions (CIU), which represented black plumbers. A representative of AFL–CIO said, "This policy has nothing to do with race. Our experience is that these CIU members have in the past worked for substandard wages." CIU applied to the National Labor Relations Board (NLRB) for an injunction that required the AFL–CIO laborers to return to work. On February 7, Judge John Keating Regan ruled that AFL–CIO workers had participated in a secondary boycott. By February 11, AFL–CIO resumed work on the arch, and an AFL–CIO contractor declared that ten African Americans were apprenticed for arch labor. The standstill in work lasted a month.

Topping out and dedication

President Lyndon B. Johnson and Mayor Alfonso J. Cervantes decided on a date for the topping-out ceremony, but the arch had not been completed by then. The ceremony date was reset to October 17, 1965; workers strained to meet the deadline, taking double shifts, but by October 17, the arch was still not complete. The chairman of the ceremony anticipated the ceremony to be held on October 30, a Saturday, to allow 1,500 schoolchildren, whose signatures were to be placed in a time capsule, to attend. Ultimately, PDM set the ceremony date to October 28.